The fastest gas and oil pipelines and communications installation by means of directional drilling under considerable depth from natural obstacles guaranties ecological safety of construction and high reliability of the crossings

” Izobilniy – Nevinnomysk ” KS” Gasline

” Izobilniy – Nevinnomysk ” KS” Gasline project, Directional drilling method of crossing the communications line” Nominal diameter 1200 mm. covers construction of six gas line sections:

  • section № 1 length 855 m.;
  • section № 2 length 488m.;
  • section №3 length 550 m.;
  • section №4 length 970 m.

“Gas line Djubga – Lazarevskoye – Sochi. Second phase of construction. Telecommunication system. Fiber optic line.”

Project “Gas line Djubga – Lazarevskoye – Sochi. Second phase of construction. Telecommunication system. Fiber optic line.” Nominal diameter 200 mm. covers installation of fiber optic line by means of directional drilling on seven landfall areas:

  • section № 1 Djubga, length 960 m;
  • section № 2 Novomikhailovsk, length 764 m;
  • section № 3 Tuapse, length 812 m;
  • section № 4 Lazarevskoye, length 580 m;
  • section № 5 Sochi, length 600 m;
  • section № 6 Kudepsta, length 1000 m;
  • section № 7 Addler, length 374 m.