Kirinskoye Gas and condensate field

Kirinskoye Gas and condensate field, situated in north-east shelf of the Sakhalin island, is one of the development targets in “Sakhalin-3″ project.
Water depth of the field is up to 85 – 90 m.

Mean design capacity of the project in a production phase is 2 mln. m3 of gas per day and 300 tons of condensate per day. Designed production period is 30 years.

Subsea production structures include six wells with subsea well heads, gathering manifold, piping system, umbilicals, MEG line and coastal subsea production unit control site.

Our company performed design authorship supervision for umbilical laying procedure, concreting of manifold feet, and additional works for manifold tie-in.